Annual Meeting of the Members
 
Thank you to everyone who attended the 48th Annual Meeting on Saturday, July 26th. It was a pleasure seeing everyone and getting the chance to answer many of the questions and concerns shared by residents. 
 
The new Directors elected are Harvey Friedman, Amin Guindi, and Mark Law. The Organizational meeting was held directly after the annual meeting with officer and committee positions as follows:
 
President                     Harvey Friedman
Vice President             Amin Guindi
Secretary                     Linda Shenwick
Treasurer                     Mark Law
Director                       Sandy Brower
 
Architectural – Sandy Brower, Amin Guindi, Harvey Friedman
L&R – Primary: Linda Shenwick; Alternate: Harvey Friedman
Enforcement – Harvey Friedman
Beach Club – Tina Brunhart
Landscaping – Joi Catlin
 
Any residents interested in joining any of the committees around the Shores are welcome. Please contact the manager if you would like to volunteer.
 
Elevators Modernization
 
Naturally, I’ve received a lot of questions and concerns about the elevators – the project progress, timeline, scope, safety, and, of course, questions about shutdowns. For the sake of transparency, I’d like to provide a full summary of the project from the start and expectations moving forward. 
 
In February of 2023, we began the process of modernizing the elevators, which were nearing the end of their useful life. The first step was hiring a consultant to create specifications and an RFP to search for contractors. HKA Elevator Consulting was hired and created specifications to replace the current machine with a modern, non-proprietary, gearless, roped, traction machine. Mitsubishi, Kone, Otis, and 24-Hour Elevator responded to the RFP. By October of the same year, the Board was reviewing bids from each contractor.
 
Over the next several months, the Board narrowed their decision to Kone and Otis, separated the interior modernization from the base bid, voted against exterior door cladding because of cost, and investigated the potential to work with Otis' belt drive rather than traditional ropes because of the large savings. Finally, in June 2024, Otis’ Gen 3 controller and machine were approved for installation at a total cost of $720,361. 
 
Obviously, the Shores’ summer schedule was the most important factor to everyone involved, and Otis agreed they could meet our demand by starting the project on October 14th, 2024, and finishing on May 19th, 2025. This allowed for a month and a half buffer before July in case of any unforeseen errors. This turned out to be wishful thinking, however.
 
From the start, we were hearing of delays. Despite my scheduling all site surveys, submitting state applications, and approving all blueprints with our consultant on time, Otis still reported that the state was delayed in providing a modernization variance, and that manufacturing – of Otis’ proprietary equipment, mind you – was behind schedule. What was supposed to be an October 14th start date turned into a January 6th start date and then finally a February 3rd start date. At the time, I requested updated Gantt charts to keep track of their progress. Even their best-case scenario had them finishing in early September with no overtime. We had to accept that the project would continue through summer but assumed the first cab would be complete in May, as planned.
 
Instead, the state didn’t inspect the first cab until June 17th, but that inspection wasn’t completed because he found that the wrong size governor had been installed and was not safe to operate. The inspector would need to come back after the repair. The earliest date they could provide was July 11th, leading to several weeks of the Otis technicians looking for ancillary work to do, and even missing a week of work when there was nothing else to do. Finally, the state approved the cab on the 11th, and it was put into use on Monday, the 14th.
 
The board met with representatives from Otis on multiple occasions to have them account for their failures. They will now be working overtime until the project is completed, with turnover scheduled for October 15th.
 
Since the start of the project, there have been 6 trouble calls that staff have not been able to resolve without calling a technician to the building. The most common error we experience is a misaligned interlock on the outer doors on one of the floors, caused by abuse when entering and exiting the cab. The interlock rollers have to be 1/8” away from the inner doors to work properly, and every time someone pulls the doors apart, the lock is torqued and can cause the cab to stop unexpectedly. In those moments when you felt that the elevator was “falling” a floor, you heard something clip the doors on the way up, or the cab stopped suddenly and opened on a floor with no one waiting, it’s likely because the interlock was misaligned. The majority of time, staff can get the cab working again, but when we can’t, a technician is called. 3 of those 6 trouble calls are door-related. 
 
The other issues are technical. The first problem with the new cab happened the first week it was operating. A safety sensor on the machine, which constantly checks for continuity through the belts, alerted that continuity was lost and stopped moving as a safety precaution. Effectively, the elevator thought that one of the belts had split or torn and was unsafe to operate. The technician overrode the error while waiting for a replacement. That same issue has now come back and was the cause of another shutdown. There have been multiple early morning planned shutdowns to investigate every inch of the belts to make sure they’re safe, but nothing has been found. The team is investigating why the sensor keeps failing. The final error was from a faulty jump cable cross connected to the old cab to keep the fire alarm system working. The technician found that the wire arched, and the cab could not be removed from fire department recall. He eventually found the error late at night and repaired it.
 
Lastly, a few residents have told me about being hurt by the elevator doors when getting into the cab. At first, I had our tech increase the dwell time – the time before the doors close – but there were still issues during times of heavy traffic. What's more, during times of low traffic, the cab takes too long to get up the building. Instead, I’ll be having our tech decrease dwell time again, but remove nudging. Nudging is a safety feature where the doors will close at a reduced speed and torque after a predetermined time while sounding a warning signal. Once removed, the alarm will still sound, but the doors will remain open if there is an obstruction, and you’ll be able to wave your hand to stop it from closing as it begins to shut. 
 
The most important thing to remember is that the elevator is safe to use.
 